paintbrush, paint, diy, brush, tool, renovation, construction, work, handyman, repair, fix, improvement, house, home, equipment, gray home, gray work, gray construction, gray painting, gray paint, gray tools, paintbrush, diy, renovation, handyman, handyman, handyman, handyman, handyman. Documented renovations compared: the decisions homeowners keep repeating
Photo by ClickerHappy on Pixabay

Reviews

Part of Rehabilitation case studies: four lessons for owners of old houses

Documented renovations compared: the decisions homeowners keep repeating

Five documented house projects show the same decisions returning, from where additions go to how new kitchens and baths are fitted into an old plan.

What to take away

  • Five owner-occupied house projects from This Old House show the same decisions: Dorchester (1979), Concord (1989), Nantucket (1994), Auburndale (2010), and Jamestown (2019).
  • Trinity Church, the Willard, the Ford plant, the Emporium, and Hotel Phillips are the five commercial documented renovations compared in the Park Service case studies; bulletin ITS 37 covers additions.
  • Change lands at the rear and inside; the street elevation and entrance sequence stay.
  • New use is fitted to the old plan far more often than the plan is cut to suit the new use.
  • Every good project carries one visible compromise, usually a service item with nowhere better to go.
  • Decide where that compromise falls before a technician decides for you.

Read enough documented projects and the same handful of decisions appear. Each arrives as a question that feels open and is usually more settled than it looks. They sharpen what you ask a contractor, since the documents a reviewed project has to produce make a decision defensible.

Five owner-occupied projects, one pattern

This Old House has documented owner-occupied renovations since 1979. Five projects show the recurring decisions at house scale. Each is a real house, not a hypothetical.

ProjectHouseThe recurring decisionWhat the decision produced
This Old House, Dorchester, Massachusetts (1979)The series' first project, a 1920s bungalowWhere to put a new kitchen and bath in a small planA working kitchen and bath inside the existing plan; the front rooms kept their use
This Old House, Concord, Massachusetts (1989)A 1700s farmhouseHow to route modern services without cutting new chases through original roomsServices in secondary spaces; original rooms left without new chases
This Old House, Nantucket, Massachusetts (1994)A house on NantucketHow to handle exterior exposure and weather at a coastal siteExterior repairs and weather detailing; the street face left as found
This Old House, Auburndale, Massachusetts (2010)A 1920s Dutch ColonialHow to fit a modern kitchen into a plan that had no room for oneThe kitchen placed in space the plan already had; the front rooms unchanged
This Old House, Jamestown, Rhode Island (2019)A coastal Rhode Island houseWhere to put the one service compromiseThe single compromise placed at the rear, away from the entrance

Published costs for these projects are not comparable across decades and regions. A rear addition of this kind typically runs $250 to $450 per square foot of new space in the United States, depending on structure, region and finish (typical range).

The same decisions return in commercial projects. The Park Service lists buildings adapted for a new use under the federal rehabilitation tax credit. The credit covers 20 percent of qualified rehabilitation spending on income-producing certified historic buildings. The Park Service certifies the building and the work. An owner-occupied house does not qualify, and state programs vary.

Five Projects, One Decision

Project

Trinity Church
Rear wing rooms
Willard Hotel
Existing shafts
Ford Assembly
Open floor
Emporium
Core atrium
Hotel Phillips
Refitted rooms

Recurring decision

Trinity Church
Worship untouched
Willard Hotel
No new chases
Ford Assembly
Craneway intact
Emporium
Facades alone
Hotel Phillips
Lobby unchanged

Three criteria line up the five commercial projects: where the change lands, how services are routed, and what is left untouched. On all three the pattern holds.

Each entry below comes from the Park Service tax credit case study library. The buildings date from 1877 to 1931.

ProjectBuildingThe recurring decisionWhat the change produced
Trinity Church, BostonH.H. Richardson's 1877 church on Copley SquareNew parish rooms placed in the rear wing, worship space untouchedNew parish rooms in the rear wing; the worship space and Copley Square front unchanged
Willard Hotel, Washington1901 hotel at 1401 Pennsylvania Avenue, reopened in 1986Modern services threaded through existing shafts, not new chasesServices in existing shafts; finished rooms left without new chases
Ford Assembly Building, Richmond, CaliforniaAlbert Kahn's 1931 plant on the Richmond waterfrontNew industrial use kept in the open floor, historic craneway intactNew industrial tenants in the open floor; the craneway kept
Emporium, San Francisco1896 department store by Albert Pissis on Market StreetAtrium cut in the core, street facades left aloneAn atrium in the core; the Market Street facades unchanged
Hotel Phillips, Kansas City1931 Art Deco hotel at 12th and BaltimoreGuest rooms refitted behind an unchanged lobby and entryRefitted guest rooms; the lobby and entry unchanged

Each entry is a certified rehabilitation, not a house.

The Park Service bulletin ITS 37, rear additions, works through why a rear location, a set-back connection and a subordinate scale make an addition acceptable, and what happens when one of those is missing.

Change goes to the back

The most consistent pattern is spatial. Primary elevations, principal rooms and the entrance sequence are retained. Kitchens, service areas, rear elevations and secondary rooms carry the alterations.

Trinity Church is the clearest case. The 1877 building by H.H. Richardson kept its Copley Square front, and the new parish rooms went into the rear wing. At the Emporium, the Market Street facades stayed while the new atrium opened the core.

For a house the translation is short. If you want more space, look behind the building before looking above it or in front of it.

New use fits the old plan

Adaptive reuse projects are studied because the new function had to fit without destroying the building. The recurring move is to put the demanding new requirements where the building has the most tolerance.

The Ford Assembly Building shows it at industrial scale. Albert Kahn's 1931 plant kept its open floor and its craneway, and new tenants moved into space the plant already had. At house scale the same test applies to a home office in a back bedroom or two front rooms knocked together.

The decisions these documented projects share

Decision / What documented projects usually do

More space
Rear addition, subordinate in scale
Modern services
Route through secondary spaces and existing chases
Accessibility
Address at a secondary entrance where possible
Energy performance
Air sealing and attic work before wall interventions
Damaged features
Repair, replace in kind, then substitute as a last step
Later alterations
Evaluate individually rather than removing wholesale
Review standard
The Secretary of the Interior's Standards, which put repair before replacement
Funding
The 20 percent federal credit on income-producing buildings, with state credits on top where they exist
Owner-occupied funding
State credits cover some owner-occupied homes; the federal 20 percent credit does not

None of these is a rule. They are the pattern of what survived review and aged well. Each row has an exception, usually driven by a condition the building already had: a lost feature, a previous alteration, or a site constraint that removed the obvious option.

Which of those you face is a survey question, and what survives is usually more than a first walk-through suggests.

Where the compromise lands

Almost every good project has one visible compromise, usually in the same spot: a service requirement placed somewhere less than ideal. A building has fewer good hiding places than the equipment list has items. A vent, a meter, a condenser, a hatch.

Decide in advance where your compromise will be. That beats discovering it when a technician chooses for you.

The house-scale version of these comparisons is in the tempting option and the sound one, and the method for reading documented projects is in how to use renovation case studies properly.

Common questions

Is a rooftop addition ever acceptable on a house?

Rarely, and only where it cannot be seen from the street. On most houses a rear addition is the workable option. The rear is the one side where a new volume can sit without altering the street elevation or the roofline.

Should an addition match the original?

Compatible, not imitative. Matching proportion and material without copying detail is the usual approach. A set-back and a lower ridge line do more for the match than any copied trim.

How do I decide what is a primary space?

Finish quality, ceiling treatment, trim detail and original function. The best rooms announce themselves. The entrance sequence and the principal facade usually count as primary too.

Can I put the kitchen anywhere?

Practically, wherever drainage allows. Historically it sat at the back of the house, which is usually also where the change belongs. Moving it to the front puts plumbing and vents in the rooms a reviewer will defend.

Does the rehabilitation tax credit cover a house?

The 20 percent federal credit needs an income-producing certified historic building, so an owner-occupied house does not qualify. Several states run their own credit, and some of those cover owner-occupied homes.

Filed underus homeowners

More in Reviews

Latest from Fabric Desk